
A machine stands on someone else's floor. A clear agreement protects both sides.
- What kind of agreement it is
- Terms to consider
- Preparing for the conversation
- Assessing the site first
- Location and number of units
- Several machines at one site
- Fee or commission
- Power and how it is billed
- Service access
- Liability and insurance
- Termination and removal
- Recording the condition of the spot
- Range and prices
- Cleanliness around the machine
- Signage and contact details
- Reports and communication
- Settlements and paperwork
- Many sites, one template
- A trial period
- Changes along the way
- The form of the agreement
- Questions for your lawyer
- Common mistakes
- How to prepare
- Locations
- FAQ
The conversation with the site owner went well. There is a spot by the entrance, there is an outlet, and there is agreement on a coffee and snack machine. Now it all needs to be written down. A good agreement does not have to be long, but it should answer the questions that will come up sooner or later: who pays for power, when the technician can enter the building, and what happens if the machine is damaged. This article suggests which topics to think through before signing and how to prepare for the conversation. It does not replace legal advice.
What kind of agreement it is
The agreement between an operator and a site owner is usually a lease (najem), a usufructuary lease (dzierżawa), or an unnamed contract governed by the Polish Civil Code, including its provisions on lease (najem, Article 659 et seq.) and usufructuary lease (dzierżawa, Article 693 et seq.). It should cover the placement spot, fee or commission, power costs, service access, liability for damage, insurance, and termination terms. Have a lawyer review the wording. How the agreement is named and structured depends on what the parties agree, so this article focuses on content rather than legal form.
Terms to consider
The topics most often discussed are:
- location and number of units,
- fee or commission,
- power and how it is billed,
- service access,
- liability and insurance,
- termination and removal.
Below we go through each in practical terms: which questions to ask and what to settle before the agreement goes to a lawyer.
Preparing for the conversation
Before you sit down with the site owner, write down what you want. How many machines do you plan to place? What commission can you offer at the expected sales level? How often will the technician visit? What insurance do you have? The better you prepare your answers, the smoother the conversation. Also ask the owner what they expect: which products, what the machine should look like, and which service hours suit them. A shared list of topics is a good starting point for a draft agreement.
Assessing the site first
Before negotiating terms, make sure the site makes business sense. How many people pass the spot where the machine will stand each day? Is there a canteen, shop, or café nearby? What hours is the building open? The answers help you estimate sales, which in turn tells you what commission or fee you can offer. It is better to walk away from a site during talks than to sign an agreement that will not pay off.
Location and number of units
Describe the spot as specifically as possible: floor, hallway, which wall, and how many machines. A sketch or photo attached to the agreement helps. Also settle what happens if the owner wants to move the machine elsewhere, for example during renovation. Who pays for the move? How much notice does the owner give the operator? If you plan to add another machine later, think about whether the agreement should provide for it or whether an amendment will do.
Several machines at one site
Large buildings such as office towers, hospitals, or universities often have several machines in different places. Think about whether one agreement covers all of them or whether each has separate terms. One agreement with an annex listing the spots is often easier to manage. Also decide how individual machines are added or removed without changing the whole agreement, for example by updating the annex.
Fee or commission
Settlement with the site owner can take different forms: a fixed fee, a commission on sales, or a mix of both. Each model has its advantages. A fixed fee gives predictability; a commission shares the risk. Agree on what the commission is calculated from, how often it is settled, and on what data. If the machine has telemetry, the sales report can be the basis for settlement. Also note how the owner can check the data if they have doubts.
Power and how it is billed
A machine runs around the clock, so power use is a real cost. Agree on who bears it and how it is calculated. Options vary: a flat fee, a separate submeter, or including power in the commission. The machine maker usually states power consumption in the documentation, which helps estimate a flat fee. Also ask whether the outlet is suitable for a device that runs nonstop. If you are not sure, ask an electrician or the building manager to check the wiring.
Service access
The technician needs to restock, clean the machine, and fix faults regularly. Agree on the hours they can enter the building, who lets them in, and how they announce a visit. Office buildings with security often need a list of people authorized to enter. Also think about emergencies: can the technician come in the evening or on a weekend if the machine stops working? Clear access rules save both sides a lot of frustration.
Liability and insurance
A machine may be damaged by a third party, and in rare cases it may cause damage itself, such as a water leak from a coffee machine. Discuss who is responsible for what and how each side protects itself. Ask your insurer what your policy covers, and talk to the owner about their building insurance. The details of liability terms are especially worth going over with a lawyer.
Termination and removal
Any working relationship may end one day. Agree on the term of the agreement, how it can be ended, and with how much notice. Also set out how removal works: who does it, how soon after the agreement ends, and in what condition the spot is left. Well-defined exit terms keep the parting calm, even if neither side is happy about it.
Recording the condition of the spot
When you install the machine, take photos of the spot: the floor, the wall, the outlet. They will help at removal, when the condition of the spot needs assessing. A short record signed by both sides at installation and at removal is a simple way to avoid arguments over whether marks on the floor were there before.
Range and prices
Site owners often have views on what the machine sells. A company may want more healthy snacks, a hospital more water, and a university cheaper products. Decide whether the agreement describes the range or leaves it to the operator. If the owner has a say on prices, write down how. Keep in mind that overly detailed range terms can make it hard to match the offer to what actually sells.
Cleanliness around the machine
Who cleans around the machine and empties the bin next to it? The question seems minor, but it is a frequent source of misunderstandings. Decide whether cleaning belongs to the technician or the building's cleaning crew. With coffee machines, also discuss where grounds and other service waste go. A clear split of tasks keeps the area tidy, and customers are more willing to use the machine.
Signage and contact details
The machine should show the operator's contact details so customers know where to report a problem. Agree with the owner whether other stickers can go on it too, such as the operator's logo or payment information. Some owners have rules on how equipment in the building should look. It is better to learn them before installing the machine than after.
Reports and communication
Agree on who the owner's contact person is and how day-to-day matters are reported: faults, customer complaints, and requests to change the range. A simple channel, such as a shared email address or phone number, is enough in most cases. It also helps to agree on how often the parties discuss results, for example once a quarter. Regular contact catches problems before they become a reason to terminate.
Settlements and paperwork
Agree on how and how often the site owner receives a settlement. It could be an invoice, a note, or a sales report with the commission calculated. Discuss how to document these settlements with your accountant, because it depends on the model of cooperation. Regular, predictable settlements are best. Late payments are a common source of tension between operators and site owners.
Many sites, one template
Operators with many sites often use their own agreement template. That is convenient, but each site is different. Treat the template as a starting point, not a finished document. With each new site, go through the terms and check that they fit the place, its hours, and the owner's expectations. Have a lawyer review the template itself from time to time.
A trial period
At a new site, it is not always clear how sales will go. Some operators and owners agree on a trial period, after which they assess the arrangement. Think about whether a trial makes sense for you, how long it should last, and what happens when it ends. A trial gives both sides time to see whether the site meets expectations without a long commitment at the start.
Changes along the way
Over years of cooperation, a lot can change: the number of people in the building, opening hours, or the property owner. Plan how the parties change the agreement, for example by amendment. If the building changes owner or manager, it helps to know who your contracting party is. These questions are worth discussing with a lawyer when drafting the agreement.
The form of the agreement
Must the agreement be in writing? Writing makes terms easier to prove. Form requirements depend on the contract type. Even if the relationship starts with a handshake, it is worth writing down the key terms. A short document both sides understand is better than a long template nobody has read.
Questions for your lawyer
Before meeting a lawyer, prepare a list of questions. For example:
- which type of agreement fits what we have agreed,
- how to word liability for damage,
- how to secure the commission settlement,
- which termination terms are reasonable,
- what happens if the building changes owner.
Bring a draft of the terms, a description of the site, and your insurance details. This shortens the meeting and lowers its cost.
Common mistakes
A few problems come up especially often:
- no terms on power,
- unclear rules for calculating commission,
- no rules on service access outside business hours,
- no removal terms,
- using a ready-made template without adapting it to the site.
Each of these is easier to avoid at signing than to fix during the relationship.
How to prepare
Before signing, you can go through a few steps:
- write down your expectations and the owner's,
- describe the spot and attach a photo or sketch,
- agree on the settlement model and how power is billed,
- discuss service access and emergencies,
- check your insurance,
- have a lawyer review the draft.
A plan like this lets you start working together on clear terms.
Locations
The page on machine locations (publisher's site) describes site types.
Related reading: Outdoor Vending Machines.
FAQ
Must the agreement be in writing? Writing makes terms easier to prove. Form requirements depend on the contract type.
Is this article legal advice? No. It is a general overview.
This article is general information only and is not legal advice. Rules change – check the current rules or consult a lawyer before deciding.